Download Print this page

Monogram ZV48R Installation Instructions Manual page 13

Professional restaurant style vent hoods

Advertisement

2B
Alternate Mounting Method
INSTALL HOOD TO SOFFIT OR
BENEATH CABINETS
SKIP THIS STEP IF USING WALL MOUNTING
METHOD
supported by the soffit.
cabinet or soffit.
10" round duct and clearance to slide the hood back
against the wall.
A
"A" Centerline to Stud
and Keyhole Slots
A
2"
7-1/2"
8"
2-9/16"
shown in the top view illustration.
31-2000856 Rev. 0
Installation Instructions
Requires 10-1/2" Min.
Opening For Ductwork
and Hood Installation
A
"B" Hood Width At
the Top
35-15/16"
Top View
Front of Hood
8-1/8"
6"
B
Back of Hood
IMPORTANT: Soffit framing must be capable of
supporting up to 150 lbs.
Install Transition Onto Top of Hood
IMPORTANT: Remove
shipping tape from damper
and check that damper
moves freely.
and secure with 4 screws
provided.
sure the damper moves freely.
Mount Hood onto Soffit or Cabinet
NOTE: If mounting to the underside of a cabinet with a
Engage Top
1/4" Gap
Keyhole Slots
Push Back
to Wall
protrude 1/4". The 1/4" gap will provide clearance to
engage the keyhole slots in the top of the hood.
and route through the knockout (from the back or top
of the hood).
rear wall.
IMPORTANT:
be secured to the back wall. Use wall anchors to
fasten bottom back of hood to the wall.
Duct
Transition
Soffit
Add Shims
If Bottom
Is Recessed
Back
Wall
13

Advertisement

loading

This manual is also suitable for:

Zv36rZv30rZx48dc6Zx36dc6Zx48dc12Zx36dc12