Download Print this page

Monogram ZV48R Installation Instructions Manual page 10

Professional restaurant style vent hoods

Advertisement

REMOVE THE PACKAGING
from the "V" shaped
cardboard section.
Remove shipping pads.
IMPORTANT: Lift the hood
by grasping the outside
opening on the top.
is shipped secured to
the skid with 4 screws.
Locate and remove 2
screws on each side of
the motor. Discard the
shipping skid and screws.
PARTS PROVIDED
Locate the parts packed with the hood.
Duct Transition
with Damper
2 Implement Rods
and 4 Stand-offs
(3 filters with 48" models)
10
Installation Preparation
Duct
Transition
Wood
Mounting
Parts
Hood
Support
Motor
Mounted
on Skid
Shipping Carton
Heat Lamp
(2 with 48" models)
Backguard
with Original Screws
and lift out.
grease trays. Set
grease filters and trays aside
loosen (do not remove) the
2 screws holding the wood
mounting support to the back of
the hood. The screws should be backed out of the wood
to 1/4". Remove the set aside the mounting support with
all supplied parts.
HARDWARE PACKAGE
Locate and check contents.
Screws shown actual size.
6 (3/16") hollow wall
use 2 to secure
hood to the wall at
the bottom. Use 4 to
secure backguard
and shelf.
secure the transition to the
hood outlet on the top
machine screws
to secure shelf to
bottom of hood.
Use 6 to secure hood to
secured to wood support)
Use 2 to secure 30" and 36"
backguards to wall. Use 4 to
secure a 48" backguard.
4 screws to secure the
wood support to the wall
2 flat washers
for wall anchors
the blower
2 shoulder screws
to secure shelf to
bottom of hood.
31-2000856 Rev. 0

Advertisement

loading

This manual is also suitable for:

Zv36rZv30rZx48dc6Zx36dc6Zx48dc12Zx36dc12