Mounting Of The Charging Column; Use Of The Prefabricated Foundation; Casting Of An Own Foundation With Foundation Plate - Wallbe Pro Installation Manual

Wallbox & charging column
Table of Contents

Advertisement

Installation manual
Figure 1: Wall mounting plate with integrated cable
holder
6 mm hole for countersunk head screws
6 mm hole for countersunk head screws
8 mm hole
Threaded sleeve for fixing the plastic
cover
Cable bushing
Cable holder for charging cable
For mounting the wall charging station proceed as
follows:
1. Mark the drill hole
on the mounting surface.
2. Drill the hole
and insert the dowel.
3. Drill the hole
and
4. Fasten the wall mounting plate to the drill holes
and
with countersunk head screws and align the
plate with the spirit level.
5. Place the housing on the mounting brackets of the
wall mounting plate.
6. Open the full metal housing of the wallbe Pro.
On the bottom of the housing you will find 8 mm
holes
in the four corners for fastening the full
metal housing.
7. Fasten the full metal housing with all four screws
Driving eMobility
and the drill holes
and
and insert the dowels.
and washers.

3.3 Mounting of the charging column

In order to mount the charging column, a foundation
must first be laid. This preparatory work must be car-
ried out by a contracted construction company.

3.3.1 Use of the prefabricated foundation

In the simplest case, use our prefabricated foundation.
The mounting of the charging station therefore is sig-
nificantly simplified. In this prefabricated foundation an
empty pipe and the foundation plate with four threa-
ded rods are already cast. The shape of the prefabri-
cated foundation may differ from the shape in Figure 2
and Figure 3. The shape and dimensions of the founda-
tion plate, which can be seen in Figure 4, are relevant.
Figure 2: Prefabricated foundation - side view
Figure 3: Prefabricated foundation - top view
5/18

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sc220k24260449095968

Table of Contents