For the use of the prefabricated foundation proceed as
follows:
1. For the prefabricated foundation, dig a excavation pit
with a minimum area of 100 x 80 cm and a minimum
depth of 60 cm.
2. Make a compacted gravel bed.
3. Pull only one supply cable at a time through the
empty conduits in the prefabricated foundation.
4. Bring the prefabricated foundation into position so
that the upper edge of the foundation plate coinci-
des with the top edge of the finished floor.
5. Underlay the prefabricated foundation and level the
foundation with a spirit level.
3.3.2 Casting of an own foundation with foundation plate
If you want to pour your own foundation, use our
foundation plate. It already has the right size, the
hole for the empty pipe is already there and the
threaded rods are fixed in the right place.
Figure 4: Foundation plate - side view
Driving eMobility
Figure 5: Foundation plate - top view
To cast your own foundation with foundation plate,
proceed as follows:
1. For the foundation, dig a excavation pit with a mini-
mum area of 100 x 80 cm and a minimum depth of
60 cm.
2. Make a firm gravel bed.
3. Fix the foundation plate in the desired position.
The short ends of the threaded rod stand vertically
upwards. The upper edge of the foundation plate
corresponds to the top edge of the finished floor.
4. Pull only one supply cable at a time through the
empty conduits.
5. Insert the empty conduits about 5 cm through the
holes in the foundation plate and fix the empty
conduits.
6. Lay the empty pipes as required.
7. Align the foundation plate with the spirit level.
8. Pour out the excavation pit so that the concrete is
in complete contact with the underside of the foun-
dation plate. The upper side of the foundation plate
must not be covered with concrete.
3.3.3 Casting of an own foundation without foundation
plate
To cast your own foundation without foundation plate,
proceed as follows:
1. For the foundation, dig a excavation pit with a mini-
mum area of 100 x 80 cm and a minimum depth of
60 cm.
2. Make a compacted gravel bed.
3. Pull only one supply cable at a time through the
empty conduits.