Installation Of The Wallbe Pro Charging Pillar; Installation Using The Pre-Built Foundation Incl. Stainless Steel Mounting Plate - Wallbe Pro 3,7kW Installation And User Manual

Table of Contents

Advertisement

6.2 Installation of the wallbe Pro charging pillar

6.2.1 Installation using the pre-built foundation incl. stainless steel mounting
plate
6.
Dig a hole of at least 80 x 100 x 55 cm (Length x Width x Depth) for the pre-built
foundation
7.
Guide the electrical supply line through the empty conduits in the pre-built
foundation.
8.
Place the pre-built foundation at the desired position within the beforehand digged
hole and use the excavated soil to keep it in place.
9.
Mount your wallbe Pro charging pillar onto the stainless steel mounting plate using
the included screws.
10. Connect the supply line according to your wallbe Pro model. Please follow the
instructions in chapter "5.1 Supply line connection".
26
wallbe GmbH – Paderborner Str. 76 – 33189 Schlangen
Tel: +49 5252 989440 Mail: inquiry@wallbe.de

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pro 7,4kwPro 11kwPro 4,6kwPro 22kw

Table of Contents