Machine Installation And Assembly; Installation Environment; Electricity Installation - SunStar HC Series User Manual

Dual function
Table of Contents

Advertisement

MACHINE INSTALLATION AND ASSEMBLY

Install your machine in an appropriate environment and with adequate electrical supply. Failure to follow the
directions may result in machine malfunction.

2-1) INSTALLATION ENVIRONMENT

1) Temperature: ① 0~40℃ (32~104℉) when the machine is in operation
② -25~55℃ (-13~131℉) when the machine is not in operation
2) Humidity: 45~90% (relative)
[CAUTION]
Do not let moisture drops on the machine.
Provide air conditioning to control humidity and to prevent dust and corrosion.
3) Grounding: Ensure the electricity is properly grounded.
Properly ground the machine to avoid the possibility of electric shock. Use three-wire
grounding (grounding resistance below 100 ohms).
DANGER
4) Close any doors and windows near the machine to prevent direct light, dust, and humidity.
5) Foundation under the machine must be a sufficiently strong and flat concrete to support the weight of the machine.

2-2) ELECTRICITY INSTALLATION

Check if the input voltage of the machine is in the right range of the voltage supply before installing or operating
the machine. The voltage required is as follows:
1) Input voltage (to be adjusted when installing): 100V, 110V, 120V, 200V, 220V, 240V
2) Allowed range of voltage: within 10% of the voltage set
3) Electric capacity and voltage consumption: 600VA 400W
4) Insulation resistance: over 10M ohms (measured with 500V insulation tester)
Check the voltage supply where the machine will be installed.
Install the cable away from the operator's work space to prevent accident or injury.
WARNING

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents