Page 8
Reader Start Get FP template, 1 beep, light off, switch to 485 Getting control order timeout? Only FP verification? FP or card verification? Get card number FP and card already?? verification? Send FP template to access control panel Send card number Only card and FP template to verification?...
Page 10
Reader Start Get card, 1 beep, light off, switch to Getting control order timeout? Only card verification? FP or card verification? Send card number to access control Only card verification? Verification result timeout? FP and card verification? Pass the verification? Send no data to access control panel, switch to main mission, waiting for FP and follow the...
FCC Caution: Any Changes or modifications not expressly approved by the party responsible for compliance could void the user's authority to operate the equipment. This device complies with part 15 of the FCC Rules. Operation is subject to the following two conditions: (1) This device may not cause harmful interference, and (2) this device must accept any interference received, including interference that may cause undesired operation.