Graco E-flo iQ 26B543 Installation-Parts page 39

Dispense system for urethane
Table of Contents

Advertisement

F
. 30. Power Disconnect
IG
3A8217A
2. Set the Ram Air Regulator (BB) to 0 psi.
3. Set the Ram Director Valve (BC) to UP.
4. Slowly increase the pressure on the Ram Air
Regulator until the Platen (AD) starts to raise, and
immediately press and hold the Blowoff Button (BE)
until the Platen is completely out of the drum.
AK
Excessive air pressure in the material drum could
cause the drum to rupture, causing serious injury. The
Platen must be free to move out of the drum. Never
use drum blowoff air with a damaged drum.
5. Release the Blowoff Button (BE) and allow the Ram
to rise to its full height.
AZ
BE
F
. 31. Integrated Air Controls
IG
6. Remove the empty drum.
Shutdown and Care of the Pump
BC
BB
39

Advertisement

Table of Contents
loading

Table of Contents