Attach Drum Stops; Install Vented Oil Cap Before Using Equipment - Graco E-flo iQ 26B543 Installation-Parts

Dispense system for urethane
Table of Contents

Advertisement

Installation

Attach Drum Stops

The iQ Ram Supply Units are shipped with drum stops
in place to help position the drum on the Ram Assembly
(AA). For replacement parts, order Kit 255477. The kit
includes 2 each of capscrews, lock washers (not
shown), and drum stops.
F
. 14: Drum Stop Installation
IG
1. Locate the correct set of mounting holes on the
Ram Assembly base. See F
2. Using the capscrews and lock washers, attach the
drum stops to the Ram Assembly base.
55 gal (200 L)
8 gal (30 L)
F
. 15: Ram Base
IG
24
Capscrews
Drum Stops
. 15.
IG
D200s Base
30 gal (115 L)
16 gal (60 L)
5 gal (20 L)
Install Vented Oil Cap Before
Using Equipment.
The Driver gear-box is shipped from the factory
pre-filled with oil. The temporary unvented cap prevents
oil leaks during shipment. Replace this temporary cap
with the vented oil cap supplied with the equipment
before use.
NOTE: Prior to use, check oil level. Oil level should be
half way up the sight glass.
Vented Cap
F
. 16: Unvented and Vented Oil Caps
IG
Unvented
Cap
Sight Glass
3A8217A

Advertisement

Table of Contents
loading

Table of Contents