Hardware Preparation and Installation

2.1

Unpacking and Inspecting the Module

Damage of Circuits
Electrostatic discharge and incorrect blade installation and removal can damage
circuits or shorten their life.
Before touching the blade or electronic components, make sure that you are
working in an ESD-safe environment.
Shipment Inspection
To inspect the shipment, perform the following steps:
1. Verify that you have received all items of your shipment:
Printed Quick Start Guide and Safety Notes Summary
RTM-ATCA-736x-10G
Any optional items ordered
2. Check for damage and report any damage or differences to the customer service.
3. Remove the desiccant bag shipped together with the blade and dispose of it according
to your country's legislation.
The blade is thoroughly inspected before shipment. If any damage occurred during
transportation or any items are missing, please contact our customer's service
immediately.
2.2

Environmental and Power Requirements

In order to meet the environmental requirements, the blade has to be tested in the system
in which it is to be installed.
Before you power up the blade, calculate the power needed according to your combination
of blade upgrades and accessories.
RTM-ATCA-736x-10G Installation and Use (6806800P29G)
NOTICE
Chapter 2
27

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the RTM-ATCA-736x-10G Series and is the answer not in the manual?

This manual is also suitable for:

Rtm-atca-736x-10gRtm-atca-737x-10gRtm-atca-736x-10g-sp

Table of Contents