Power Distribution; Total Power; Hvac - Verizon Volicon MIP Admin Manual

Table of Contents

Advertisement

Access and peripherals
← It is recommended to attach a dedicated display, keyboard, and mouse so that during urgent
service there is no delay in logging into the server.
← Attach LAN and video cables as needed per application.

Power Distribution

3.2.1
Servers should preferably be on dedicated circuits so that if one trips, it will not affect more than one
power supply module per server.
MIP systems should be connected to a UPS or a similar high availability power supply.

Total Power

3.2.2
Add the power requirements of all other onsite equipment to obtain total system power
consumption.

HVAC

3.2.3
Ensure your HVAC has sufficient cooling capacity to handle the total power (Watts) of heat dissipated
by the servers, as well as your other onsite equipment.
AG-7.2.B1-092414 • Restricted - customer use only
16

Advertisement

Table of Contents
loading

Table of Contents