Integration Hours Counter; Loads Wiring Test - Ariston ELIOS 25 Manual

Digital control unit for thermal solar systems
Table of Contents

Advertisement

P6

: INTEGRATION HOURS COUNTER

Using this parameter it is possible to display the actual number
of hours of the integrative source operation or reset it.
AFTER SELECTIN PARAMETER P PRESS T E '
KEY.
T E DISPLAY S O S ' ' AND ACTUAL OURS OF
ACTI ITY OF T E INTE RATI E SOURCE.
PRESS T E '
' KEY T E DISPLAY
S O S ' ' FLAS IN .
PRESSIN T E '
' KEY RESETS T E COUNTER
PRESSIN T E ' esc ' A AIN S O S T E CURRENT
RUNNIN
The counter recording the running hours of the integrative
source can handle values up to
value is reached the counter stops.
'
OURS.
. Once the maximum
31
P7

: LOADS WIRING TEST

This parameter allows to set the test of the loads wired to
the control unit as well as the wirings themselves.
Depending on the con gured scheme the power unit will
activate the loads connected by sequentially activating all
the available outlets for 1 seconds each including the alarm
relay and its buzzer.
The number of times for which the entire test is repeated in
multiples of 5 can be set using the single ' TMR ' parameter
present. The activation of the test is signalled on the display
with the ' TIMER ' icon.
AFTER SELECTIN PARAMETER P PRESS
T E '
T E DISPLAY S O S ' TMR ' AND T E NUM ER OF
CYCLES IN T E TEST.
PRESS '
'. T E DISPLAY
S O S 'TMR' FLAS IN .
' KEY.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

3104047

Table of Contents