Mh-400 Factory Recommended Settings Guide; Mh 400 Sh Twin Spinner Suggested Application Guide - Toro MH-400 Operator's Manual

Material delivery unit
Hide thumbs Also See for MH-400:
Table of Contents

Advertisement

Always test new materials by spreading them in an open
area away from people.
4. Start the tow vehicle and turn on the tow vehicle
hydraulics.
5. On the SH model turn on the on/off pendant switch
to start spreading. On the EH model turn on the
option then the conveyer belt with the control
pendant
6. On the SH model turn off the on/off pendant switch
to stop spreading. The Twin Spinner will continue to
operate. On the EH model turn off the conveyer belt
and then the option.
7. For EH models the "all start" function can be used in
place of the option start, belt start functions as a
single operation start feature. The option will start
followed by the belt.

MH-400 Factory Recommended Settings Guide

MH400
Twin Spinner settings
Pendant
Tow vehicle rpm
Ground speed
Note: Different materials vary in the size of their particles, causing variations in the spread pattern. Before top dressing the
required area, test new materials by spreading them in an open area away from bystanders.

MH 400 SH Twin Spinner Suggested Application Guide

Application
Application
Factor
Operating Instructions
Settings for Best Performance
Base setting: factory recommended application
setting as per desired spread pattern.
Twin Spinner: Leave on during application.
Conveyor belt: Turn off between passes.
Full throttle (maximum rpm) – 540 PTO speed
5-8 km/h (3-5 mph)
Spinner
Floor
Speed
Control
8. When the MH-400 is empty, turn off the hydraulics
before transporting the MH-400.
Note – When driving over uneven terrain, raise the MH-
400 to the maximum safe traveling range. This provides
more ground clearance for the Twin Spinner See safety
decals on page 12 for safe traveling range.
W
ARNING
objects while spreading. The Twin
Spinner can throw material at high
speeds up to 12 m (40 ft).
: While traveling but not spreading, raise
I
MPORTANT
the MH-400 to the maximum safe traveling distance,
and turn off the Twin Spinner.
Additional Performance
Test the spread pattern in a neutral area
then make very small adjustments.
At the start of each new load, it takes
1–3 seconds for material to reach the
spreading option and begin discharging.
An engine at full rpm provides the maximum
hydraulic flow and pressure. Always warm
up the engine and the hydraulic system
before use.
Travel at about the speed of a fast walk.
Base
Disc
Rear Gate
Setting
Setting
: Watch for people and other
Application Spread
Width
Page 29

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

449304493144933449344493744938

Table of Contents