Assembly And Installation - Delta CliQ DRP024V060W1AA Technical Data Sheet

Din rail power supply
Table of Contents

Advertisement

TECHNICAL DATASHEET
CliQ DIN Rail Power Supply
24V 60W 1 Phase / DRP024V060W1AA
Output Load De-rating VS Input Voltage
Assembly & Installation
The power supply unit (PSU) can be mounted on 35mm DIN rails in accordance with EN 60715. The device should be installed with input
terminal block at the bottom.
Each device is delivered ready to install.
Mounting
Fig. 2.1 Mounting
Snap on the DIN rail as shown in Fig. 2.1:
1.
Tilt the unit upwards and insert it onto the DIN rail.
2.
Push downwards until stopped.
3.
Press against the bottom front side for locking.
4.
Shake the unit slightly to ensure that it is secured.
In accordance to EN 60950 / UL 60950 and EN 62368 / UL 62368, flexible cables require ferrules.
Use appropriate copper cables designed to sustain operating temperature of at least 75°C or more to fulfill UL requirements.
For stranded wires, it is recommended to use suitable lug to crimp wires.
All parameters are specified at 25°C ambient and AC input unless otherwise indicated.
8
www.DeltaPSU.com (November 2020, Rev. 08)
No output power de-rating across the entire
input voltage range
Dismounting
Fig. 2.2 Dismounting
To uninstall, pull or slide down the latch with screw driver as
shown in Fig. 2.2. Then slide the power supply unit (PSU) in the
opposite direction, release the latch and pull out the power
supply unit (PSU) from the rail.

Advertisement

Table of Contents
loading

Table of Contents