4 INSTALLATION
4
INSTALLATION
The installation must be carried out by a professional.
NOTE!
Mains supply requirements
This equipment complies with IEC 61000-3-12 provided that the short-circuit power
is greater than or equal to S
and the public system. It is the responsibility of the installer or user of the equipment
to ensure, by consultation with the distribution network operator if necessary, that
the equipment is connected only to a supply with a short-circuit power greater than
or equal to S
scmin
4.1
Location
Position the welding power source such that its cooling air inlets and outlets are not
obstructed.
4.2
Mains power supply
Check that the welding power source is connected to the
correct mains power supply voltage, and that it is protected by
the correct fuse size.
A protective earth connection must be made in accordance with
regulations.
Recommended fuse sizes and minimum cable area
Mains voltage
230 V ± 10%, 1~ 230 V ± 10%, 1~ 230 V ± 10%, 1~ 230 V ± 10%, 1~
Mains frequency
50/60 Hz
Mains cable area
3G2.5
2
mm
Phase current I
9 A
1eff
Fuse
anti-surge
16 A
type C MCB
13 A
0460 826 374
at the interface point between the user's supply
scmin
. Refer to the technical data in the TECHNICAL DATA chapter.
Rating plate with supply connection data
Tig 1500i
TIG (GTAW)
MMA (SMAW)
50/60 Hz
3G2.5
11 A
16 A
13 A
- 10 -
Tig 2200i
TIG (GTAW)
MMA (SMAW)
50/60 Hz
50/60 Hz
3G2.5
3G2.5
11 A
14 A
16 A
16 A
16 A
16 A
© ESAB AB 2019