Maintenance
9.4 Preventive maintenance
Note
The fiber-optic cables for the gating boards must be properly inserted in the connectors.
9.4.3.5
Checking the cable and screw terminals
● Check the cable and screw terminals regularly to ensure that they are secure.
● Tighten the screws if necessary. When doing this, comply with the specified torques.
● Check the cabling for defects.
● Replace any defective parts immediately.
9.4.3.6
Inspecting door limit switches
● Inspect the door limit switches regularly for contamination and corrosion.
● Also verify that the the door limit switches function correctly at regular intervals.
9.4.3.7
Checking the cooling circuit
● Check the entire cooling circuit for leaks. If you find a leak in a pipe coupling, tighten the nut
● Compare the measured conductivity value with the permissible conductivity value for the
● Check the water level in the compensating chamber of the deionized water circuit. If the
See also
The external raw water circuit (Page 36)
110
by a ¼ turn
system (≤ 0.6 µS/cm). You must replace the ion exchanger if this value is close to 1 µS / cm.
level is too low, add some more water. If the level is too high, drain some water until the level
is correct.