Trianco EuroStar Premier 50/90 Condensing User, Installation, Commissioning & Servicing Instructions
Trianco EuroStar Premier 50/90 Condensing User, Installation, Commissioning & Servicing Instructions

Trianco EuroStar Premier 50/90 Condensing User, Installation, Commissioning & Servicing Instructions

Oil fired central heating boilers for balanced or conventional flue
Hide thumbs Also See for EuroStar Premier 50/90 Condensing:

Advertisement

Quick Links

TRIANCO
Premier 50/90 Condensing
Premier 100/125 Condensing
OIL FIRED CENTRAL HEATING BOILERS
FOR BALANCED OR CONVENTIONAL FLUE
BED 92/42 EEC
EMC 89/336 EEC
USER, INSTALLATION
COMMISSIONING & SERVICING
INSTRUCTIONS
To be retained by householder

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the EuroStar Premier 50/90 Condensing and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Trianco EuroStar Premier 50/90 Condensing

  • Page 1 TRIANCO Premier 50/90 Condensing Premier 100/125 Condensing OIL FIRED CENTRAL HEATING BOILERS FOR BALANCED OR CONVENTIONAL FLUE BED 92/42 EEC EMC 89/336 EEC USER, INSTALLATION COMMISSIONING & SERVICING INSTRUCTIONS To be retained by householder...
  • Page 2 HEALTH AND SAFETY INFORMATION FOR THE INSTALLER AND SERVICE ENGINEERS Under the Consumer Protection Act 1987 and the Health and Safety at Work Act 1974, it is a requirement to provide information on substances hazardous to health (COSHH Regulations 1988). The Company takes every reasonable care to ensure that these products are designed and constructed to meet these general safety requirements, when properly used and installed.
  • Page 3: Table Of Contents

    CONTENTS PAGE 1. USER INSTRUCTIONS How to use your Trianco Boiler After sales service information 2. INTRODUCTION 3. TECHNICAL INFORMATION Technical specifications Wiring diagram 4. INSTALLATION Regulations Health and Safety Siting the Boiler System Design Ventilation Extractor fan Electrical supply Condensate Drain Connection 5.
  • Page 4: User Instructions

    1. USER INSTRUCTIONS BOILER CONTROL THERMOSTAT Please note, to assist Trianco in improving customer The boiler control thermostat allows you to select the service, it is important that the guarantee/registration temperature of the water leaving the boiler. It is calibrated card is returned.
  • Page 5 SYSTEMS CONTROLS Sludge and water caused by condensation should be drawn off at the tank drain-cock annually. ROOM THERMOSTAT SIMPLE FAULT FINDING The room thermostat should not be positioned near a If the burner fails to start for no apparent reason, make source of heat such as a radiator or be exposed to direct the following checks before calling your service engineer.
  • Page 6: After Sales Service Information

    What happens if my installer/engineer is oil), or with equipment not supplied by Trianco. unavailable? Step 3: Contact Trianco Direct. We will provide you with • the name and telephone number of our Where the appliance falls outside the guarantee Service Agent.
  • Page 7: Introduction

    NO x emissions into a room-sealed balanced flue appliance by using a Trianco balanced flue kit. These kits allow the boiler to be When installed in conjunction with a Trianco balanced installed in a wide variety of site conditions. (see flue kit, the boiler becomes a room-sealed appliance.
  • Page 8: Technical Information

    3. TECHNICAL INFORMATION 50/90 100/125 ALL DIMENSIONS IN MM ALL UNUSED TAPPINGS ARE TO BE PLUGGED OFF RETURN CONNECTION DIA 22MM EACH SIDE FLOW CONNECTION DIA 22MM EACH SIDE OIL PIPE OR ELECTRIC CABLE ENTRY BOTH SIDES Fig. 3 OUTLINE DIMENSIONS Cleaning Cleaning Hole...
  • Page 9: Technical Specifications

    - white with grey fascia trim Thermal Insulation - boiler shell insulated with glass fibre Optional Extras - Trianco balanced flue kits - programmer kit (Trianco part code 2340) Electricity Supply - 230/280V - 50Hz Fused at 5 amp. Model Output Output...
  • Page 10: Wiring Diagram

    FIG. 5 WIRING DIAGRAM...
  • Page 11: Installation

    In the interest of safety, it is recommended that the See Fig. 6 for air openings required for Trianco EuroStar appliance is installed, commissioned and maintained by boilers.
  • Page 12: Ventilation

    Where a boiler is also used for providing domestic hot Ventilation (Room sealed balanced flue boilers) water, a double feed indirect cylinder to BS 1566 Part 1 Although no openings are required for the supply of must be used. combustion air (this comes from outside through the air MAKE SURE ALL UNUSED BOILER TAPPINGS ARE duct system direct to the burner), ventilation is, however, PLUGGED BEFORE FILLING THE SYSTEM.
  • Page 13: Condensate Drain Connection

    Condense Drain Connections The condensate pipe can be run to either the left or the Ensure that the trap is in accessible position for any right side of the boiler. future servicing and maintenance to take place. Before initial firing, the condensate trap must be filled with water To install the condensate pipe, after deciding the position to prevent the escape of flue gases.
  • Page 14: Oil Supply

    5. OIL SUPPLY Fire Protection The oil burner is factory set to burn Kerosene C2 to BS 2869. To comply with building regulation Section J5: Note: Only Kerosene is permitted for use on this appliance. Where a storage tank is close to a dwelling, fire cladding must be provided to the eaves, if less than IMPORTANT NOTE: 1.8m from the top of the tank.
  • Page 15: Two Pipe Oil Supply

    Two pipe oil supply (Fig. 12) Oil De-aerator - Single pipe supply (Fig. 13) Where the bottom of the oil storage tank is below the burner, a two pipe suction lift system is necessary. Where a two pipe suction lift system is required, but the When using a two pipe system, it is important to remove return pipe is too long, or impractical to run, an Oil De- bypass washer from the oil pump on the burner.
  • Page 16 MAXIMUM OIL SUPPLY LINE LENGTH ‘L’ HEAD ‘H’ METRES. .0.5 MAXIMUM PIPE 6mm ID LENGTH PIPE 8mm ID (METRES) FIG. 11 SINGLE PIPE OIL SUPPLY INSTALLATION MAXIMUM OIL SUPPLY LINE LENGTH ‘L’ LIFT ‘H’ METRES. .0.5 PIPE 6mm ID MAXIMUM LENGTH PIPE 8mm ID (METRES)
  • Page 17 • • FIG. 13 DE-AERATED OIL SUPPLY INSTALLATION...
  • Page 18: Flue System

    All components used in the flue system should be suitable stainless steel inner skin (suitable for condensation), for wet flues. The design and construction of the Trianco insulation and incorporate seals and be weather proofed. balanced flue kits take these factors into account so the following guidance notes are for conventional chimneys.
  • Page 19: Balanced Flue System

    (c) Positioning of flues under balconies and carports Whereas some balanced flue boilers rely on case sealing should be avoided. to achieve a room seal, Trianco boilers have a sealed air (d) As the system operates under positive pressure, duct system which maintains the room sealed it is essential that all flue joints are sealed correctly.
  • Page 20: 2350 & 2351 Round Bf Kits

    Trianco flue kits are designed to incorporate the latest ‘O’-ring seals. Before commencing assembly, please make sure that all ‘O’-rings seals are in position. 2350 & 2351 HORIZONTAL TELESCOPIC BF IMPORTANT: TO AID ASSEMBLY, IT IS NECESSARY TO APPLY A THIN BEAD OF LUBRICANT (E.G.
  • Page 21 (7”) (18”) Fig. 19...
  • Page 22 FIG.17 KIT 2350 & 2351 ROUND FLUE KIT TERMINAL ELBOW DUCT ASSEMBLY 1 END CAP Supplied with boiler V-PIECE 1 SELF-TAPPING SCREWS 2* GASKET 1 SEALING PLATE GASKET (SUPPLIED Supplied with boiler WITH BOILER) FLUE PIPE O RING 10 JUBILEE CLIP * Assembled together FIG.18 FLUE POSITION DIMENSIONS IMPORTANT...
  • Page 23: Commissioning

    7. COMMISSIONING 8. SERVICING The boiler/burner MUST be commissioned by a qualified IMPORTANT: ISOLATE ELECTRICAL SUPPLY TO THE technician, preferably OFTEC trained and registered. BOILER BEFORE SERVICING It is the responsibility of the installer to ensure the boiler To maintain the boiler’s high thermal efficiency and is properly commissioned, failure to do so will make the reliable operation, it should be serviced annually by boiler’s guarantee and any extended warranty null and...
  • Page 24: Servicing The Boiler

    Servicing the Boiler 10 Check to ensure that the condense drain is working and not blocked by pouring a small amount of water into condenser unit and checking to see that water 1 Remove the flexible air supply hose from the flue kit discharges from condense port.
  • Page 25: Fault Finding

    9. FAULT FINDING ELECTRICITY SAFETY - Before making any electrical checks, switch off mains supply to boiler. FAULT POSSIBLE CAUSE ACTION BURNER WILL NOT START Control box locked out Press reset button on front of burner. N.B. ONLY TRY TWICE Limit-stat tripped Press reset button under control panel and check function of boiler control thermostat.
  • Page 26 FAULT FINDING (Cont’d) FAULT POSSIBLE CAUSE ACTION MORNING START LOCK-OUT Faulty non-return valve or air leak Replace non-return valve and cure leak. in two pipe system Low voltage Check with local Electricity Board. Combustion readings incorrect Check combustion under normal running conditions and compare readings with those given under ‘Burner Settings’.
  • Page 27: Spares

    EuroStar Boiler Spares Item Description 50/90 100/125 Boiler Body 223201 223301 R/H Side Panel Assembly 223091 223340 L/H Side Panel Assembly 223094 223343 Top Panel 223175 223346 Door 223083 223323 Fascia 223105 223105 Control Panel 223097 223097 Casing Stiffener 223170 223170 Condensing Unit Clamp 223133...
  • Page 28 Fax: (0114) 245 1419 www.trianco.co.uk © Trianco Limited, Copyright in this brochure and the drawings or illustrations contained in it is vested in Trianco Limited and neither the brochure or any part thereof may be reproduced without prior written consent.