Trianco EuroStar Premier 50/90 Condensing User, Installation, Commissioning & Servicing Instructions
Trianco EuroStar Premier 50/90 Condensing User, Installation, Commissioning & Servicing Instructions

Trianco EuroStar Premier 50/90 Condensing User, Installation, Commissioning & Servicing Instructions

Oil fired central heating boilers for balanced or conventional flue
Hide thumbs Also See for EuroStar Premier 50/90 Condensing:

Advertisement

Quick Links

TRIANCO
Premier 50/90 Condensing
OIL FIRED CENTRAL HEATING BOILERS
FOR BALANCED OR CONVENTIONAL FLUE
BED 92/42 EEC
EMC 89/336 EEC
USER, INSTALLATION
COMMISSIONING & SERVICING
INSTRUCTIONS
To be retained by householder

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the EuroStar Premier 50/90 Condensing and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Trianco EuroStar Premier 50/90 Condensing

  • Page 1 TRIANCO Premier 50/90 Condensing OIL FIRED CENTRAL HEATING BOILERS FOR BALANCED OR CONVENTIONAL FLUE BED 92/42 EEC EMC 89/336 EEC USER, INSTALLATION COMMISSIONING & SERVICING INSTRUCTIONS To be retained by householder...
  • Page 2 HEALTH AND SAFETY INFORMATION FOR THE INSTALLER AND SERVICE ENGINEERS Under the Consumer Protection Act 1987 and the Health and Safety at Work Act 1974, it is a requirement to provide information on substances hazardous to health (COSHH Regulations 1988). The Company takes every reasonable care to ensure that these products are designed and con- structed to meet these general safety requirements, when properly used and installed.
  • Page 3: Table Of Contents

    CONTENTS PAGE 1. USER INSTRUCTIONS How to use your Trianco Boiler After sales service information 2. INTRODUCTION 3. TECHNICAL INFORMATION Technical specifications Wiring diagram 4. INSTALLATION Regulations Health and Safety Siting the Boiler System Design Ventilation Extractor fan Electrical supply Condensate Drain Connection 5.
  • Page 4: User Instructions

    BOILER the boiler. The boiler thermostat operates between 55°C (low) and The Trianco EuroStar Condensing boiler has been 82°C (high). designed and constructed to give years of trouble free service. These instructions are provided to assist you in...
  • Page 5 SYSTEMS CONTROLS Sludge and water caused by condensation should be drawn off at the tank drain-cock annually. ROOM THERMOSTAT SIMPLE FAULT FINDING The room thermostat should not be positioned near a If the burner fails to start for no apparent reason, make source of heat such as a radiator or exposed to the sun the following checks before calling your Service Engineer.
  • Page 6: After Sales Service Information

    What happens if my installer/engineer is oil), or with equipment not supplied by Trianco. unavailable? Step 3: Contact Trianco Direct. We will provide you with • the name and telephone number of our Where the appliance falls outside the guarantee Service Agent.
  • Page 7: Introduction

    Trianco balanced flue kit. These kits allow the boiler to be Two flow and return sockets are provided to facilitate installed in a wide variety of site conditions. (see bal- connection to the heating system.
  • Page 8: Technical Information

    3. TECHNICAL INFORMATION ALL DIMENSIONS IN MM ALL UNUSED TAPPINGS ARE TO BE PLUGGED OFF RETURN CONNECTION DIA 22MM EACH SIDE FLOW CONNECTION DIA 22MM EACH SIDE OIL PIPE OR ELECTRIC CABLE ENTRY BOTH SIDES Fig. 3 OUTLINE DIMENSIONS Cleaning Hole Heating Heating...
  • Page 9: Technical Specifications

    - Factory set at 110° C (hand reset) Casing Finish - Stove enamelled white with coloured facia trim Thermal Insulation - Boiler shell insulated with fibre glass Optional Extras - Trianco Balanced Flue Kits and Programmer Kit Electricity Supply - 230/280V - 50Hz Fused at 5 amp.
  • Page 10: Wiring Diagram

    FIG. 5 WIRING DIAGRAM...
  • Page 11: Installation

    In the interest of safety, it is recommended that the See Fig. 6 for air openings required for Trianco EuroStar appliance is installed, commissioned and maintained by boilers.
  • Page 12: Ventilation

    Electrical Supply Ventilation (Room sealed balanced flue boilers) 230V 1 Phase 50Hz (Fused 5 Amp) Although no openings are required for the supply of combustion air (this comes from outside through the air Note: THIS APPLIANCE MUST BE EARTHED duct system direct to the burner), ventilation is, however, necessary if the boiler is installed in a compartment or a All electrical wiring must be carried out by a qualified confined space in order to prevent overheating of the...
  • Page 13: Condensate Drain Connection

    Condense Drain Connections IMPORTANT TRAP MUST BE FILLED WITH On the back edge of the condensing unit there are 2 WATER BEFORE INITIAL FIRING screws, when they are removed they provided 2 cleaning TO FORM A SEAL AND STOP holes to allow the drain sockets to be cleaned. FLUE GASSES ESCAPING CONDENSE The condense drainpipe can be fitted to either the left or...
  • Page 14: Oil Supply

    5. OIL SUPPLY Fire Protection To comply with building regulation Section J5: Where a storage tank is close to a dwelling, fire The oil burner is factory set to burn Kerosene C2 to BS 2869. cladding must be provided to the eaves, if less than 1.8m from the top of the tank.
  • Page 15: Two Pipe Oil Supply

    Two pipe oil supply (Fig. 12) Oil De-aerator - Single pipe supply (Fig. 13) Where, the bottom of the oil storage tank is below the burner, a two pipe suction lift system is necessary. Where a two pipe suction lift system is required, but the When using a two pipe system, it is important that the return pipe is too long, or impractical to run, an Oil De- by-pass screw is fitted, on the BFP II pump remove the...
  • Page 16 MAXIMUM OIL SUPPLY LINE LENGTH ‘L’ HEAD ‘H’ METRES. .0.5 MAXIMUM PIPE 6mm ID LENGTH PIPE 8mm ID (METRES) FIG. 11 SINGLE PIPE OIL SUPPLY INSTALLATION MAXIMUM OIL SUPPLY LINE LENGTH ‘L’ LIFT ‘H’ METRES. .0.5 PIPE 6mm ID MAXIMUM LENGTH PIPE 8mm ID (METRES)
  • Page 17 • • FIG. 13 DE-AERATED OIL SUPPLY INSTALLATION...
  • Page 18: Flue System

    All components used in the flue system should be suitable stainless steel inner skin, insulation and incorporate for wet flues. The design and construction of the Trianco seals and be weather proofed. balanced flue kits take these factors into account so the following guidance notes are for conventional chimneys.
  • Page 19: Balanced Flue System

    Whereas some balanced flue boilers rely on case sealing As the flue system operates under positive to achieve a room seal, Trianco boilers have a sealed air pressure, it is essential to ensure that all flue duct system which maintains the room sealed joints are made.
  • Page 20: 2350 & 2351 Round Bf Kits

    Trianco flue kits are designed to incorporate the latest ‘O’-ring seals. Before commencing assembly, please make sure that all ‘O’-rings seals are in position. 2350 & 2351 HORIZONTAL TELESCOPIC BF IMPORTANT: TO AID ASSEMBLY, IT IS NECESSARY TO APPLY A THIN BEAD OF LUBRICANT (E.G.
  • Page 21 FIG.17 KIT 2350 & 2351 ROUND FLUE KIT TERMINAL ELBOW DUCT ASSEMBLY 1 END CAP Supplied with boiler V-PIECE 1 SELF-TAPPING SCREWS 2* GASKET 1 SEALING PLATE GASKET (SUPPLIED Supplied with boiler WITH BOILER) FLUE PIPE O RING 10 JUBILEE CLIP * Assembled together FIG.18 FLUE POSITION DIMENSIONS IMPORTANT...
  • Page 22 2350 600mm Horizontal Round Telescopic BF Kit Dimension ‘A’ KIT 2350 MODEL 50/90 (7") 175mm MIN (18") 455mm MAX ° ° ° IMPORTANT When installing the flue system it is HOLE REQUIRED 130MM DIAMETER important that the flue assembly THROUGH WALL TO TAKE TERMINAL inclines slightly from the boiler.
  • Page 23: Commissioning

    7. COMMISSIONING 8. SERVICING The boiler/burner MUST be commissioned by a qualified IMPORTANT: ISOLATE ELECTRICAL SUPPLY TO THE technician, OFTEC trained and registered. BOILER BEFORE SERVICING It is the responsibility of the installer to ensure the boiler To maintain the boiler’s high thermal efficiency and is properly commissioned, failure to do so will make the reliable operation, it should be serviced annually by a boiler’s guarantee and any extended warranty null and...
  • Page 24: Servicing The Boiler

    223050 4-OFF PART NO 223053 BOILER FLUE 1-OFF COVER IMPORTANT WHEN RE-FITTING BAFFLES ENSURE THEY ARE RE-FITTED AS SHOWN IN ARRANGEMENT SHOWN IE GAP ALTERNATING FROM FRONT TO BACK ON BOILER BAFFLES. FIG. 20 BAFFLE DETAILS FOR TRIANCO PREMIER 50/90...
  • Page 25: Fault Finding

    9. FAULT FINDING ELECTRICITY SAFETY - Before making any electrical checks, switch off mains supply to boiler. FAULT POSSIBLE CAUSE ACTION BURNER WILL NOT START Control box locked out Press reset button on front of burner. N.B. ONLY TRY TWICE Limit-stat tripped Press reset button under control panel and check function of boiler control thermostat.
  • Page 26 FAULT FINDING (Cont’d) FAULT POSSIBLE CAUSE ACTION POOR FLAME CUT-OFF Air in pump or at back of nozzle Bleed pump through pressure gauge port, also check for leaks in oil line if 2-pipe system. Oil contaminated with water Run off oil at burner until free of water and drain condensation from tank.
  • Page 27: Spares

    EuroStar Boiler Spares Item Description No. Off 50/90 Boiler Body W.U 223200 R/H Side Panel Assembly 223091 L/H Side Panel Assembly 223094 Top Panel Assembly 223175 Back Panel 223086 Boiler Control Thermostat 206896 Limit Thermostat 206892 Flue Socket Plate 223135 Flue Sealing Gasket 223138 Top Baffle W.U.
  • Page 28 Fax: (0114) 257 1419 www.trianco.co.uk © Trianco Limited, Copyright in this brochure and the drawings or illustrations contained in it is vested in Trianco Limited and neither the brochure or any part thereof may be reproduced without prior written consent.