(b) Attach Stud Mount
using 2 drywall anchors
M2 ASSEMBLY GUIDE
ASSEMBLY GUIDE CONT.
and 2pcs long wood
BUILDING YOUR FRAME PART 2: BUILDING THE WASTEBOARD (BAG D)
screws in Bag D
4. Set the 4'x8' Wasteboard to the legs and rest it on the footer. Attache to legs with D1
Step 5: Attach Wasteboard to Legs
screws. This will help to flatten your wasteboard for smother cuts.
Step 4: Attach Footer to Legs
Step 2: Mount Top Beam to Stud Mounts on wall
in Bag D to attach top beam
Rest Wasteboard
on Footer
Step 3: Attach last two Stud Mounts
5. Lean the wasteboard against your wall of choice. Measure wall studs and where
Step 5: Attach Wasteboard to Legs
top of wasteboard leans on wall. Attach stud mounts for wasteboard, with larger
ends closer to the ground, so that the wasteboard will lean on them at the desired
15 degree angle. Use D2 screws.
This work is licensed under the creative commons Attribution
NonCommercial-NoDerivatives 4.0 International license.
ASSEMBLY GUIDE CONT.
(a) Find stud and attach
first Stud Mount using 2pcs
long wood screws in Bag D
Step 4: Attach Footer to Legs
Use 8pcs short wood screws in Bag D to attach top beam
6pcs long wood
screws in Bag D
Step 5: Attach Wasteboard to Legs
Stud Mounts directly below
first Stud Mounts
Rest Wasteboard
on Footer
4pcs long wood
screws in Bag D
6pcs long wood
screws in Bag D
Rest Wasteboard
on Footer
17
(b) Attach Stud Mount
using 2 drywall anchors
and 2pcs long wood
screws in Bag D
4pcs long wood
screws in Bag D
6pcs long wood
screws in Bag D
Last Updated 11.09.2020
Version 1.14
Need help?
Do you have a question about the M2 and is the answer not in the manual?