Running A Control Solution Test
You need the meter, a test strip, and control solution.
1. Put a test strip into
2. The meter turns on.
the meter in the
Press M button or C button to select CS, press
direction of the
power button to confirm the control solution mode.
arrow.
(
means control solution mode,
before meal mode and
Note: Setting the meter in control solution mode will prevent the control solution reading from
being added to your memory and averages.
3.
Place the meter on a flat
surface, like a table.
4.
Remove the control
solution bottle cap and
wipe the tip of the bottle
with a tissue.
5.
Squeeze the bottle until a
tiny drop forms at the tip of
the bottle and place
solution on top of bottle
means
cap.
means after meal.)
23
Need help?
Do you have a question about the EMV3.1 and is the answer not in the manual?