Starting work at the jobsite

– Run the digger for 15 to 20 mins to improve the fluidity of the hydraulic oil.
– When placing the BRV on the track, apply the 2 manual parking brakes [3] so it stays in posi-
– Couple the BRV and the rail-road digger using the coupling bar [5].
– Place the rail brushes [4] in working position. Remove the safety shaft pins [a], pull the brush
4
TRAVEL POSITION
– Start the BRV running and leave it running for 5 minutes without moving to allow the hydraulic
tion. *Option: Negative brake (see Chapter 7 - Optional equipment)
out and turn it over. Put the safety shaft pins back in place.
oil to flow into the system.
Société des Anciens Établissements L.GEISMAR – Prohibited Reproduction ©
3
5
WORKING POSITION