3 – 3
Fitment within loading gauges
When placing the machine on or taking it off the rails, it may exceed the loading gauge. Special
safety measures must be defined in agreement with the rail network operator prior to placing or
removing the BRV on or off the rails.
Lower section: The BRV exceeds the temporary storage loading gauge (NF 58-002 Appendix D).
When passing over track equipment, the digger driver must raise the BRV.
Page 18
Société des Anciens Établissements L.GEISMAR – Prohibited Reproduction ©