Keep all handles, steps, railings, stands, platforms and ladders clean at all times!

8.2 Maintenance Schedule

Work on the technical (electrical, hydraulic, pneumatic) equipment of the machine may only be carried
out by qualified personnel!
Carry out welding, flame cutting and grinding work on the machine only when this is expressly permitted.
Before starting welding, flame cutting and grinding work, clean the machine and its environment of dust
and inflammable substances and ensure adequate ventilation! There is a risk of fire and explosion!
The spare and wear parts indicated in the technical documentation must be replaced immediately in the
event of damage.
Maintenance overview
Various inspection and maintenance operations have to be carried out during the period of machine
operation. The corresponding intervals to be observed are indicated in the maintenance schedule. The
maintenance intervals for outsourced parts indicated in the annexed suppliers' documentation must also
be observed.
The maintenance intervals should be shortened if the machine is operated under more arduous
operating and ambient conditions.