INSTALLATION
Location and mounting arrangements - refer to the relevant sections of this manual for
the location and mounting details.
Installation of this equipment must include the provision of a suitable and locally
positioned power isolation switch or circuit breaker. Indication of the purpose of the
switch or circuit breaker is strongly recommended. An over-current protection device
should be rated to a maximum of 10 A.
This equipment and all power isolation devices must be installed in a location and
position that allows safe and easy access to their operation and is able to rigidly support
the equipment.
Do not install this equipment in a location that would expose it to impact or high levels
of vibration.
Operation of this equipment, other than in a manner specified by the manufacturer, may
impair the safety protections provided.
The safe installation of this equipment and any system incorporating this equipment is
the responsibility of the installer. Ensure local regulations and requirements are referred
to prior to any installation commencing.
Michell Instruments
7

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Promet EExd and is the answer not in the manual?

Table of Contents