Download Print this page
Growatt SPH3000-6000TL BL-UP Quick Start Manual

Growatt SPH3000-6000TL BL-UP Quick Start Manual

Advertisement

Quick Links

Battery BOX
Quick Installation Manual
1.
Overview
1
1.Front panel
6.Magnetic devices
11.EPS connector
16.DIP and Dry connector 17.Batterypower terminal
Note:
1. This file will be updated from time to time due to product upgrades or other reasons. Unless otherwise agreed, this document is intended
as a guide only. All information and suggestions do not constitute an express or implied warranty. The final interpretation of the content is
at Growatt.
2. This document is for quick guidance installation only. For details, please refer to the User Manual.
3. Machine damage caused by failure to follow the content is not covered by the warranty.
2.
Installation
System Overiew
Hybrid Inverter
PV Array
EPS Grid
DC
AC
Breaker
Breaker
AC
Breaker
Sensor
AC
EPS
Load
Load
Grid
L line
15m
Load
CT METER
N line
L line
Load
Grid
5m
CT
L line
L
-
in
-
L out
15m
METER
-
N in
-
N out
Note:
1. The installation of this hybrid system needs
to comprehensively consider the position of
the battery and the power collector.
2. You can choose CT or electric meter to
connect to the inverter. If there are strict
requirements on the limited output power, it
is recommended to use an electric meter.
2.3
Monitoring device installation
1
2
3
4
2.Double color LED
7.Heat sink
12.Reserved hole
2.1
Installation requirements
Battery
DC
Breaker
Electrical Grid
AC
Breaker
2.2
CT meter/CT/METER
2
Up
USB
5
6
7
3.LCD screen
8.PV switch
13.AC grid connector
≥300mm
≥300mm
≥300mm
Wall mounting
3
The Inverter Side
SPH3000-6000TL BL-UP Quick Guide
8
9
10 11 12 13
4.Push button
9.PV connector
14.USB port
565
532
138
≥300mm
200
16.5
The Inverter Side
USB
14
15
16 17
5.Wall hole
10.Grounding screw
15.communication ports
188
461.5
588
Note:
Be careful : Avoid water
and electricity pipes
when punching holes in
the wall, otherwise it may
be dangerous.
Follow the installation
steps:
1. Remove the USB
waterproof cover.
2. Plug in the
communication module.
3. Lock the
communication
module.

Advertisement

loading
Need help?

Need help?

Do you have a question about the SPH3000-6000TL BL-UP and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Growatt SPH3000-6000TL BL-UP

  • Page 1 Battery BOX Quick Installation Manual SPH3000-6000TL BL-UP Quick Guide Overview 10 11 12 13 16 17 1.Front panel 2.Double color LED 3.LCD screen 4.Push button 5.Wall hole 6.Magnetic devices 10.Grounding screw 7.Heat sink 8.PV switch 9.PV connector 13.AC grid connector 14.USB port...
  • Page 2 Connecting cables Please prepare the cable before connecting as follows. Cable name Type Recommend module Note: Grounding cable A multi-core yellow-green copper cable 13AWG/2.5mm² 1. Lithium battery has its own power line Two or three different color multi-core copper and communication line, so use them. AC output cable 9AWG/6mm²...
  • Page 3 3.3.2 Plug in PV terminal Note: 1. Please make sure the PV input voltage/ current not beyond the specification before plug in. 2. When installing the PV terminal, pay attention to the distinction between the positive and negative terminals and the one- to-one correspondence between the terminals and hybrid inverter.
  • Page 4 ATS-S. Please wire this by yourself. Set Register 1053 to 1 and Register 1060 to 3. E PS Service and contact Shenzhen Growatt New Energy Co., Ltd. 4unit 1, The Cromwell Centre, Hainault Business Park, Roebuck Rd, Ilford IG6 3UG 02085006618 service.uk@growatt.com https://www.ginverter.com...