Installation; Installation Step 1: Surveying The Installation Site - Honeywell Vertex Edge User Manual

72-point continuous monitor
Hide thumbs Also See for Vertex Edge:
Table of Contents

Advertisement

CHAPTER
3
The installation procedure for the Vertex Edge System consists of six steps:
1. Surveying the Installation Site;
2. Optional Floor Mounting;
3. Installing Sample Lines;
4. Installing Pump Exhaust Line;
5. Electrical Power;
6. Data Acquisition System.

Installation Step 1: Surveying the Installation Site

A survey of the site helps you to make important decisions before installing your Vertex Edge
System. Topics in this section are intended to assist you with appropriate placement of the Vertex
Edge System and in determining if you have special filtering needs at the sampling location.
The site should:
Be remote from the monitored location;
l
Have sufficient ventilation for cabinet cooling;
l
Have power available; and
l
Be indoors in an area that is not subject to wide variations in temperature and humidity.
l
Note: The recommended humidity is 20-65% RH and a temperature between 59°F to 95°F (15°C
to 35°C).
Placement of the Vertex Edge System
Install the Vertex Edge System in an environmentally- protected site remote from the
manufacturing or storage locations that it monitors.
You can place the Vertex Edge System away from sample locations with sample tubing up to
400ft. (122m) length.
Exposure to Dust and Humidity
Exposure to corrosive gases or materials, excess moisture, dust and other unusual environmental
conditions could seriously hamper the unit's monitoring ability and could cause damage to it.
Allow room around the Vertex Edge System for ventilation and servicing.
Vertex Edge System

Installation

27
User Manual

Advertisement

Table of Contents
loading

Table of Contents