Honeywell Vertex Edge User Manual page 37

72-point continuous monitor
Hide thumbs Also See for Vertex Edge:
Table of Contents

Advertisement

Verifying Neutral Connection
Touch the red multimeter lead to the neutral connection and touch the black lead to the ground
lug. The voltage value should not exceed 5 VAC.
Verifying Operating Voltage
Touch the red multimeter lead to the line/hot connection and touch the black lead to the
neutral. The meter should display a voltage value of 208~240VAC.
Note: After confirming line and neutral connections and the operating voltage is within the
specified range, power up the Vertex Edge unit and check the operating voltage again to assure
the voltage under load is within the specified range for safe operation.
Vertex Edge Transformer Installation
The directions and diagrams enclosed herein are intended to illustrate the proper installation
and wiring of transformers designed to step-down or step-up site voltage to proper levels for
Vertex Edge operation. The information provided has been gathered from Sola/Hevi-Duty for
use with their products as specified in this document.
These instructions are for high voltage equipment operating life safety equipment. Only qualified
electricians or approved Honeywell Analytics service representatives should perform these tasks.
Honeywell Analytics is not liable for any damages caused by incorrect installation by
unauthorized or unqualified third parties, of electrical apparatus to the Vertex Edge monitor
Design Characteristics
• UL-3R enclosures for indoor and outdoor service
• Electrostatically shielded for quality power on sizes 1 KVA and larger
• UL class 180°C insulation system, 115°C temperature rise under full load
• Conduit knockouts for side entry into wiring compartment
• Copper lead wire terminations
• Units are encapsulated with electrical grade silica sand
Design Style
Vertex Edge System
36
User Manual

Advertisement

Table of Contents
loading

Table of Contents