Installation And Commissioning; Scope Of Delivery; Storage; Transport - Honeywell RABO G16 Instruction Manual

Rotary gas meters
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1

3. Installation and commissioning

INFORMATION!
Check the packing list to ensure that you have received your
complete order. Check the type labels to ensure that the device
supplied is the one you ordered.
INFORMATION!
Check the packaging carefully for signs of damage or signs that
the device has been handled incorrectly. Report any damage to the
forwarding agent and to the local representative of the
manufacturer.
INFORMATION!
The installation material and tools are not supplied with the device.
Use installation material and tools which comply with current
health and safety regulations.

3.1 Scope of delivery

Ordered measuring instrument
Instruction manual
Product documentation
Oil – Shell Morlina S2 BL 10 or Molyduval Chemlube 315
Syringe and hose
Optional accessories depending on the purchase order
Optional: calibration certificate

3.2 Storage

Store the device in a dry and dust-free location.
Avoid constant direct sunlight.
Store the device in its original packaging.
Storage temperature: -40 to +70°C / -40 to +158°F.

3.3 Transport

INFORMATION!
Do not lift the measuring instrument by the index.
INFORMATION!
Always use the lifting lugs (see Fig. 6) for transporting large rotary
gas meters.
730xxxxxe
© Elster GmbH | All rights reserved. Subject to modification
Honeywell
19

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents