Chapter 2 — Site Requirements
N
C
ETWORK
ABLING
The library can accommodate cabling from either the bottom or the top of
the library. See
information.
Use
connectivity for the library installation.
Figure 10 Locations for network cable connections.
February 2019
R
EQUIREMENTS
Floor and Ceiling Cable Access on page 25
Figure 10
and the descriptions that follow to plan network
Cable access cutouts
BlueScale Vision
camera Ethernet port
Robotics Interface
Module (RIM)
RIM
Fibre Channel
connectors (2)
LTO-5 or later
generation drive
Library Control
Module (LCM)
Cable access cutouts
Fibre Channel
ports
Fibre Channel
connectors (2)
LTO-4 drive
Ethernet ports
Site Preparation Guide—Spectra TFinity Library
Network Cabling Requirements
for additional
RIM2
Fibre Channel
connectors (2)
TS11xx technology
drive
32
Need help?
Do you have a question about the TFinity and is the answer not in the manual?