Start-Up Operation Checklist, Smoke Monitor (Sm); Getting Started - Advanced Energy LumaSense Technologies E2T QUASAR Series Operation Manual

Flare monitors
Table of Contents

Advertisement

1. Eyepiece Lens with
Reticle
Status Red LED
2.
: Alarm
Status Green LED
3.
AGC Compensation
4.
System Gain Adjust
5.
Gain/Setpoint Selector
6.
Focus Adjust and Lens
7.
Locking Screw
Objective Lens
8.
Delay Adjust
9.
Set-Point Adjust
10.
Gain/Setpoint
11.
Monitor
Heater Connection
12.
Output PCB
13.
Main Supply
14.
Connector to Electronics
Signal I/O to Electronics
15.
7.1

Start-Up Operation Checklist, Smoke Monitor (SM)

Warning: At no time should the cover be removed unless the power is switch-off
first. When it is necessary to service the instrument with the power applied, ensure
that proper safe environmental conditions exist and that such maintenance is
authorized and pursuant to safe conditions.
7.1.1

Getting Started

1. Remove the top cover and sixteen M8 x 1.25 socket head screws.
2. Ensure that the sight path is clear.
3. Ensure that the optics are properly focused on the target (See Sections 3.2, 3.6, and 3.7).
4. Verify that the proper power and signal connections have been made as per
Chapter 4, Electrical Installation.
Caution: Ensure that safe conditions exist before applying power to the instrument.
Allow at least 30 minutes of warm-up time before proceeding.
E
T QUASAR Flare Monitors Operation Manual
2
1
(PM)
12
13
2
14
Figure 12: Opto-Electronics Module
Operating the M8100SM-EXP • 43
5
3
6
4
15
7
8
9
10
11

Advertisement

Table of Contents
loading

Table of Contents