Powering With 115 Volts Ac; Powering With 220/230 Volts Ac; Powering With 24 Volts Dc - Advanced Energy LumaSense Technologies E2T QUASAR Series Operation Manual

Flare monitors
Table of Contents

Advertisement

4.2.4

Powering with 115 Volts AC∽

Note: Voltage/fusing are factory set. Use a wire gauge appropriate to service
installation. See Appendix A for Power and Fuse Requirements and Appendix E
Engineering Drawing 613-816, Service Connections.
To connect 115 VAC to Terminal TB1:
AC Hot to terminal labeled L1/HOT
AC Neutral to terminal labeled N/NEUT
AC Ground to Safety Ground stud.
4.2.5

Powering with 220/230 Volts AC∽

Note: Voltage/fusing are factory set. Use a wire gauge appropriate to service
installation. See Appendix A for Power and Fuse Requirements and Appendix E
Engineering Drawing 613-816, Service Connections.
North American Connection, as follows to TB1:
AC Hot1 to terminal labeled L1/HOT
AC Hot2 to terminal labeled N/NEUT
AC Ground to Safety Ground stud
European Connection, as follows to TB1:
AC L1 to terminal labeled L1/HOT
AC N to terminal labeled N/NEUT
AC Ground to Safety Ground stud
4.2.6

Powering with 24 Volts DC

Note: Voltage/fusing are factory set. Use a wire gauge appropriate to service
installation. See Appendix A for Power and Fuse Requirements and Appendix E
Engineering Drawing 613-816, Service Connections.
To connect 24VDC to Terminal TB1:
+24 V DC to terminal labeled 24 V DC
24 V Return to terminal labeled RTN
Ground to Safety Ground stud
E
T QUASAR Flare Monitors Operation Manual
2
Electrical Installation • 25

Advertisement

Table of Contents
loading

Table of Contents