Reservoir / Fuelcell Drinking Tube - Specialized SHIV User Manual

Hide thumbs Also See for SHIV:
Table of Contents

Advertisement

each 550mm wire going through the center of the Extension Socket, and
routed internally into the top of the Extension Socket, toward the Di2 exit
ports at the front of the Extension Socket (fig.33/34).
33
THROUGH
EXTENSION
SOCKET
34
THROUGH
EXTENSION
SOCKET
Fig.33/34: Route the Di2 wires.
Once the wires exit the ports, they will either go through the Crossbar
wire channels then into the extensions, or straight into the extensions,
depending on the fore or aft position of the Crossbar.
Connect the Di2 wires to the shifters, then install the shifters
according to the manufacturer's instructions.
Fig.32: Route the Y-wire down the center of the Extension Socket
and Spacer Stack until it exits below the upper fork bridge, then plug
the 50mm section of the Y-wire into the remaining hole in the junction
B box in the nosecone.
16
INTO
EXTENSION
THROUGH
CROSSBAR
INTO
EXTENSION

RESERVOIR / FUELCELL DRINKING TUBE

35
BOLT TAB KEYS INTO
RESERVOIR BOLT
HOLE GROOVE
36
Install the Reservoir.
To install the Reservoir, position it behind the seat tube, then grease
and loosely install the upper bolt assembly (fig.35), followed by the
lower Reservoir bolt (fig.36). The lower bolt threads into the upper
bottle cage bolt hole and through the seat tube, then threads into
the Reservoir.
Anytime the Reservoir is being installed, to avoid damage to the
battery and/or wire, look through the seat tube to make sure
the bolt path is clear. Once confirmed, install the bolt through
the seat tube.
Once the Reservoir is held in place with both upper and lower bolts,
torque the bolts to 35 in-lbf / 4.0 Nm.

Advertisement

Table of Contents
loading

Table of Contents