Inverter Details - Assa Abloy Norton 5700 Series Installation Instructions Manual

Power operator pull and push side
Hide thumbs Also See for Norton 5700 Series:
Table of Contents

Advertisement

Attach Cover to finalize installation
1.
Align cut-outs in cover to pinion shafts.
(Figure 32)
2.
Slide cover onto unit.
NOTE: Verify all wiring and sheet metal
guards are inside cover.
3.
Secure cover to backplate with cover screws.
NOTE: If cover will not securely install onto
unit, verify backplate is not warped or twisted.
Additional support or shimming may be
required. See Sections A & B under Prepare
Frame and Door.
Adjustments made in the shaded area
should be performed by Authorized Factory
Personnel.
14
WARNING: Make sure no wiring is loose or can be
caught by cover when it is snapped into place.

Inverter Details

WARNING: 120 high volt potential present.
Make sure power is turned off during
installation procedure.
Copyright © 2016, 2019-2020, ASSA ABLOY Accessories and Door Controls Group, Inc. All rights reserved. Reproduction in
whole or in part without the express written permission of ASSA ABLOY Accessories and Door Controls Group, Inc. is prohibited.
Approved 2020-01-27
5700 Series Power Operator
Pinion Shaft Cut-out
Cover Screw
Inverter Adjustments:
Use table to determine which POT to adjust based on function.
POT
M/DLY
Motor Delay on Opening
Obstruction Detection on
OBSTR SENS
Open
P1
Closing Speed
H/O TM
Hold Open Time (5-30 Secs)
Motor Torque at Hold Open
H/O TQ
Position
P2
Opening Speed
Figure 32
Description
Function
Clockwise:
Increase
Counter
Clockwise:
Decrease
80-9357-0008-020 Rev 6 01/20

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Norton 5730Norton 5740Norton 5710

Table of Contents