Appendix C: CDHF and CDHG CenTraVac™ Chiller Start-
up Tasks to be Performed by Trane
W W A A R R N N I I N N G G
S S a a f f e e t t y y A A l l e e r r t t ! !
F F a a i i l l u u r r e e t t o o f f o o l l l l o o w w i i n n s s t t r r u u c c t t i i o o n n s s b b e e l l o o w w c c o o u u l l d d r r e e s s u u l l t t i i n n
d d e e a a t t h h o o r r s s e e r r i i o o u u s s i i n n j j u u r r y y . .
I I n n a a d d d d i i t t i i o o n n t t o o t t h h e e f f o o l l l l o o w w i i n n g g t t a a s s k k s s , , y y o o u u M M U U S S T T : :
• •
F F o o l l l l o o w w a a l l l l i i n n s s t t r r u u c c t t i i o o n n s s i i n n t t h h e e u u n n i i t t ' ' s s
I I n n s s t t a a l l l l a a t t i i o o n n , , O O p p e e r r a a t t i i o o n n , , a a n n d d M M a a i i n n t t e e n n a a n n c c e e
m m a a n n u u a a l l , , i i n n c c l l u u d d i i n n g g w w a a r r n n i i n n g g s s , , c c a a u u t t i i o o n n s s , , a a n n d d
n n o o t t i i c c e e s s . .
• •
P P e e r r f f o o r r m m a a l l l l r r e e q q u u i i r r e e d d t t a a s s k k s s i i n n a a n n y y a a p p p p l l i i c c a a b b l l e e
S S e e r r v v i i c c e e A A l l e e r r t t s s a a n n d d S S e e r r v v i i c c e e B B u u l l l l e e t t i i n n s s . .
• •
R R e e v v i i e e w w a a n n d d u u n n d d e e r r s s t t a a n n d d a a l l l l i i n n f f o o r r m m a a t t i i o o n n
p p r r o o v v i i d d e e d d i i n n S S u u b b m m i i t t t t a a l l s s a a n n d d D D e e s s i i g g n n
S S p p e e c c i i f f i i c c a a t t i i o o n n s s . .
1. G G e e n n e e r r a a l l
☐ Inspect chiller for damage (shipping or rigging).
☐ Verify and record unit nitrogen holding charge
pressure.
☐ Inspect water piping for proper installation.
☐ Inspect strainers, flow sensing devices,
isolation valves, pressure gauges,
thermometer wells, flow balancing valves,
vent cocks, and drains.
☐ Inspect cooling tower piping.
☐ Verify proper clearances.
☐ Power wiring meets size requirement.
☐ Verify proper voltage and amperage rating.
☐ Verify proper foundation installation.
☐ Verify unit isolator pads/springs have been
installed.
☐ Verify low voltage circuits are isolated from high
voltage circuits.
☐ Check equipment room for ventilation,
refrigerant monitor, rupture disk piping, and
Personal Protective Equipment (PPE).
98
N N o o t t e e : : All conditions which do not conform to the
established requirements for unit installation
MUST be corrected prior to start-up. Any non-
conforming condition which is not corrected
prior to start-up must be noted in the Non-
Compliance Form (PROD-ADF001*-EN) by the
start-up technician; this information must also be
signed by responsible site personnel before
start-up and the completed Non-Compliance
Form will become part of the start-up record,
submitted with a Start-up Check Sheet and a
Chiller Service Report.
2. P P r r e e - - S S t t a a r r t t O O p p e e r r a a t t i i o o n n s s
☐ Verify nitrogen holding charge.
☐ Calibrate the high pressure cutout control
(HPC).
☐ Meg compressor motor.
☐ Confirm proper oil pump operation.
☐ Evacuate unit.
☐ Check condenser installation.
☐ Check evaporator installation.
D D o o N N o o t t A A p p p p l l y y E E l l e e c c t t r r i i c c a a l l P P o o w w e e r r t t o o
a a U U n n i i t t i i n n a a V V a a c c u u u u m m ! !
F F a a i i l l u u r r e e t t o o f f o o l l l l o o w w i i n n s s t t r r u u c c t t i i o o n n s s b b e e l l o o w w c c o o u u l l d d
r r e e s s u u l l t t i i n n m m o o t t o o r r a a n n d d c c o o m m p p r r e e s s s s o o r r d d a a m m a a g g e e . .
D D o o n n o o t t a a p p p p l l y y e e l l e e c c t t r r i i c c a a l l p p o o w w e e r r t t o o a a m m o o t t o o r r i i n n a a
v v a a c c u u u u m m . .
F F o o r r u u n n i i t t s s w w i i t t h h i i n n s s i i d d e e - - t t h h e e - - d d e e l l t t a a s s o o l l i i d d s s t t a a t t e e
s s t t a a r r t t e e r r s s , , d d i i s s c c o o n n n n e e c c t t p p o o w w e e r r t t o o u u n n i i t t d d u u r r i i n n g g
e e v v a a c c u u a a t t i i o o n n o o r r w w h h e e n n t t h h e e u u n n i i t t i i s s i i n n a a d d e e e e p p
v v a a c c u u u u m m . . I I n n a a d d d d i i t t i i o o n n , , o o n n u u n n i i t t s s w w i i t t h h i i n n s s i i d d e e - -
t t h h e e - - d d e e l l t t a a s s o o l l i i d d s s t t a a t t e e s s t t a a r r t t e e r r s s , , a a l l l l p p o o w w e e r r t t o o
t t h h e e u u n n i i t t m m u u s s t t b b e e d d i i s s c c o o n n n n e e c c t t e e d d p p r r i i o o r r t t o o
e e v v a a c c u u a a t t i i n n g g t t h h e e u u n n i i t t a a s s l l i i n n e e p p o o w w e e r r i i s s d d i i r r e e c c t t l l y y
a a p p p p l l i i e e d d t t o o t t h h e e m m o o t t o o r r t t e e r r m m i i n n a a l l s s 4 4 , , 5 5 , , a a n n d d 6 6 . .
☐ Check electrical and controls.
☐ Inspect motor starter and control panel.
☐ Confirm all wiring connections are tight, free
of abrasion and have no sharp bends in
panel and on compressors.
☐ Inspect contactors and relays.
☐ Verify unit wiring (low and high voltage) is
correctly isolated, phased, and properly
grounded.
☐ Connect external 120 Vac power to power up
the control panel.
N N O O T T I I C C E E
CDHF-SVX01N-EN