N N O O T T I I C C E E
I I n n s s u u l l a a t t i i o o n n D D a a m m a a g g e e ! !
F F a a i i l l u u r r e e t t o o f f o o l l l l o o w w t t h h e e s s e e i i n n s s t t r r u u c c t t i i o o n n s s c c o o u u l l d d r r e e s s u u l l t t i i n n
i i n n s s u u l l a a t t i i o o n n d d a a m m a a g g e e . .
T T o o p p r r e e v v e e n n t t d d a a m m a a g g e e t t o o f f a a c c t t o o r r y y i i n n s s t t a a l l l l e e d d i i n n s s u u l l a a t t i i o o n n : :
• •
D D o o n n o o t t a a l l l l o o w w t t h h e e i i n n s s u u l l a a t t i i o o n n t t o o b b e e e e x x p p o o s s e e d d t t o o
e e x x c c e e s s s s i i v v e e s s u u n n l l i i g g h h t t . . S S t t o o r r e e i i n n d d o o o o r r s s o o r r c c o o v v e e r r w w i i t t h h
c c a a n n v v a a s s t t o o p p r r e e v v e e n n t t e e x x p p o o s s u u r r e e . .
• •
D D o o n n o o t t u u s s e e t t h h i i n n n n e e r r s s a a n n d d s s o o l l v v e e n n t t s s o o r r o o t t h h e e r r t t y y p p e e s s
o o f f p p a a i i n n t t . . U U s s e e o o n n l l y y w w a a t t e e r r b b a a s s e e l l a a t t e e x x . .
Less than 1 month
Location requirements:
•
Solid foundation
•
Vibration free
•
Dry
•
Temperature range -40°F to 158°F
(-40°C to 70°C)
•
Do not remove any plastic coverings
•
Do not charge the chiller with refrigerant
•
If additional refrigerant is on site, follow
manufacturer's storage requirements
•
Verify dry nitrogen pressure using gauge
located on the evaporator shell reads
3 to 5 psig (20.7 to 34.5 kPaG)
•
Notify the local Trane office if charge has
escaped
•
Do not operate purge unit
If the chiller will be stored for more than six months after production, contact your local Trane Service Agency for required extended storage actions to
(a)
minimize impact to the chiller and preserve the warranty.
CDHF-SVX01N-EN
1–6 months
Location requirements:
•
Solid foundation
•
Vibration free
•
Dry
•
Temperature range -40°F to 158°F
(-40°C to 70°C)
•
Do not remove any plastic coverings
•
Do not charge the chiller with refrigerant
•
If additional refrigerant is on site, follow
manufacturer's storage requirements
•
Verify dry nitrogen pressure using gauge
located on the evaporator shell reads
3 to 5 psig (20.7 to 34.5 kPaG)
•
Notify the local Trane office if charge has
escaped
•
Do not operate purge unit
•
Verify waterbox and tube bundles are
clean and dry
P P r r e e - - I I n n s s t t a a l l l l a a t t i i o o n n
Greater than 6 months
Location requirements:
•
Solid foundation
•
Vibration free
•
Dry
•
Temperature range -40°F to 158°F
(-40°C to 70°C)
•
Do not remove any plastic coverings
•
Do not charge the chiller with refrigerant
•
If additional refrigerant is on site, follow
manufacturer's storage requirements
•
Verify dry nitrogen pressure using gauge
located on the evaporator shell reads 3 to 5 psig
(20.7 to 34.5 kPaG)
•
Notify the local Trane office if charge has
escaped
•
Do not operate purge unit
•
Verify waterbox and tube bundles are clean and
dry
•
Conduct an oil analysis and verify no oil
breakdown
(a)
•
Repeat yearly
•
Replace oil if breakdown has occurred
•
If no oil analysis program has been followed,
replace oil prior to start-up
•
Every six months, check unit pressure or
vacuum and take note of changes that could
indicate a leak; contact your local Trane office if
any leaks occur
•
Every six months, start the oil pump and rotate
compressor shaft about 450° to prevent
potential bearing issues
(a)
Trane Service Agency to perform this task
•
If the chiller will be stored for more than
six months after production, contact your local
Trane Service Agency for required extended
storage actions to minimize impact to the chiller
and preserve the warranty.
•
Chillers stored five years or longer should be
inspected for leaks every five years by a
qualified service organization
; contact your local
13