Gyroplane Lubrication; Powerplant Installation - Magni Gyro M-24 Maintenance Schedule

Table of Contents

Advertisement

Task
No.
Re-install rotor assembly, having re-greased the teeter bolt. Ensure all
52
safety locking pins are fitted.
Grease rotor head bolts and bearings through the dedicated grease
53
nipples placed on the rotor head.
Check rotor brake system operation. Ensure brake works smoothly,
54
without snatching. Lubricate rotor brake cable and check for free
movement.
6.4.8

Gyroplane Lubrication:

Lubricate gyroplane as defined in section 1.7.4 of the maintenance
55
manual, in accordance with Magni Gyro Srl recommendations.
6.4.9

Powerplant Installation:

Task
No.
Check engine bearers for rust/cracks. Remove rust and re-paint where
56
necessary.
Powerplant installation. Check for signs of corrosion, cracks and leaks.
57
Verify engine mounting bolts are torqued to 34-36.5 Nm.
Engine cooling installation. Check for signs of corrosion, cracks and
58
leaks.
Task Description
Task Description
045-00-24_A M24 MAINTENANCE SCHEDULE
Task
Task
Nature
Interval
100 FH/
INSP
12 Months
100 FH/
LUB
12 Months
100 FH/
INSP
12 Months
100 FH/
LUB
12 Months
Task
Task
Nature
Interval
100 FH/
INSP
12 Months
100 FH/
INSP
12 Months
100FH/
INSP
12 Months
Issue A
Certifying
Date
Person
Certifying
Date
Person
Page 31

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

M24c

Table of Contents