Landing Gear; Flying Controls - Magni Gyro M-24 Maintenance Schedule

Table of Contents

Advertisement

Task
No.
Check general condition of mast and keel primarily for rust. Remove
rust and re-paint where necessary. Particular attention should be paid
19
to meeting area of rear nacelle and engine bearers for rusting. Check
carefully for hairline cracks, particularly near bolt holes.
Check presence and legibility of required placards and operating
20
instructions.
6.4.2

Landing Gear:

Check condition of nose wheel and steering fork. Check for excessive
21
play/shimmy. Check for bearing wear and free running. Check
lubrication.
Check condition of main landing gear bow. Check for cracks, surface
22
abrasions, scratches and corrosion. Check retaining bolts (4 off).
(Bolts should be tightened to torque value of 23-26 Nm).
Check main wheels, rims, tyres and tyre creep. Inspect condition of
23
brake discs and pads – clean replace where necessary.
24
Tyre pressures, hydraulic brake system fluid level.
6.4.3

Flying Controls:

Primary/secondary flight controls and trim systems for full and free
25
movement in the correct sense, friction devices for correct operation.
Task Description
045-00-24_A M24 MAINTENANCE SCHEDULE
Task
Task
Nature
Interval
100 FH/
INSP
12 Months
100 FH/
INSP
12 Months
100 FH/
INSP
12 Months
100 FH/
INSP
12 Months
100 FH/
INSP
12 Months
100 FH/
INSP
12 Months
100 FH/
OP/C
12 Months
Issue A
Certifying
Date
Person
Page 25

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

M24c

Table of Contents