Final Checks (Include With All Checks); Ground Run; Certification; Type Certificate And Schedule Review - Magni Gyro M-24 Maintenance Schedule

Table of Contents

Advertisement

6.2

FINAL CHECKS (INCLUDE WITH ALL CHECKS)

6.2.1

Ground Run:

Task
No.
1
Powerplant systems for leaks during and following ground run.
Instruments, systems and services. Radio for electromagnetic
2
interference.
6.2.2

Certification:

Workpack and Log Book entries have been completed and certified.
3
Ensure items due in accordance with CAP 543 have been accomplished
and certified.
6.2.3

Type Certificate and Schedule Review:

Aircraft and engine - compliance with Type Approval Data
4
Sheet/Airworthiness Approval Note.
5
Mandatory placards are installed and legible.
Review the schedule to ensure that the maintenance needs of the
aircraft are being met such that continuing safe operation can be
6
assured. Account should be taken of previous maintenance history,
operating environment and utilisation.
Task Description
045-00-24_A M24 MAINTENANCE SCHEDULE
Task
Task
Nature
Interval
INSP
All Checks
OP/C
All Checks
CHK
All Checks
CHK
Annual
CHK
Annual
CHK
Annual
Issue A
Certifying
Date
Person
N/A
N/A
N/A
N/A
Page 21