Hour Check (Only To Be Carried Out After First 25 Hours/6 Months); Flying Controls - Magni Gyro M-24 Maintenance Schedule

Table of Contents

Advertisement

6.3

25 HOUR CHECK (ONLY TO BE CARRIED OUT AFTER FIRST 25 HOURS/6 MONTHS):

6.3.1

Flying Controls:

Task
No.
7
Check pre-rotator belts tension and re-set if necessary.
Check condition of push-rods and including intermediate pivot station,
8
ensuring that pivot bolt is secured and locked. Check for any excessive
movement between bolt rose-joint and bracket. Lubricate rose-joints.
9
Inspect rudder pedals and cables.
Task Description
045-00-24_A M24 MAINTENANCE SCHEDULE
Task
Task
Nature
Interval
First 25FH/
INSP
6 Months
First 25FH/
INSP
6 Months
First 25FH/
INSP
6 Months
Issue A
Certifying
Date
Person
Page 22