100 Hour Check; Structural/Zonal - Magni Gyro M-24 Maintenance Schedule

Table of Contents

Advertisement

6.4

100 HOUR CHECK:

6.4.1

Structural/Zonal:

Task
No.
Check all bolted joints to mast, keel and axle beam for condition and
11
security.
12
Check security of nacelle attachment points.
Check condition of doors, hinges and associated mounting and locking
hardware. Ensure gap between face of locking pins (548-08-24) and
13
latching blocks (549-08-24) is less than 1mm when locking handle is
in the over-centre locked position. Confirm correct operation of door
warning system with doors open and in "latched and locked" position.
Check security of all cowlings and associated attachment hardware.
Ensure that all cowlings can be opened and closed as designed, that
14
hinges are in good condition and that locking hardware is in good
condition and working correctly.
Check condition of rudder hinges, cables and cable capstan. Clean
15
capstan and ensure cable running grooves are clean and free from grit.
Check general condition of rudder surfaces and horizontal and vertical
16
stabilizers for stone chips. Fill/re-paint where necessary.
Check cable anchor points to the rudder pulley. Ensure good condition
17
and full and free movement of system, front and rear. Check full
movement of rudder is obtainable.
18
Check underside of nacelle.
Task Description
045-00-24_A M24 MAINTENANCE SCHEDULE
Task
Task
Nature
Interval
100 FH/
INSP
12 Months
100 FH/
INSP
12 Months
100 FH/
INSP
12 Months
100 FH/
INSP
12 Months
100 FH/
INSP
12 Months
100 FH/
INSP
12 Months
100 FH/
INSP
12 Months
100 FH/
INSP
12 Months
Issue A
Certifying
Date
Person
Page 24

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

M24c

Table of Contents