Download Print this page

VERITAS 5240 Hardware Service Procedure page 7

Rail replacement: 2u12 storage shelf
Hide thumbs Also See for 5240:

Advertisement

3
Starting with one of the rails, align the pins on the front of the rail with the rack holes that the old
rail was installed in.
4
Extend the rail back and fit the pins on the back of the rail in the appropriate rack holes.
HSP #180 Rail Replacement: 2U12 Storage Shelf
7

Advertisement

loading

This manual is also suitable for:

5250