Rail replacement: 2u12 storage shelf
Hide thumbs Also See for 5240:

Advertisement

4
Collapse the rail to remove it from the rack.
Installing the new rails
To install the new rails
1
Examine the rack and the storage shelf for any potential damage before you attempt to install
the new rails.
If the rack and the storage shelf are free of damage, continue with the next step.
2
Identify the left and the right rails. The rails should be oriented as follows:
HSP #180 Rail Replacement: 2U12 Storage Shelf