We value your experience using Sunny Health and Fitness products. For assistance with parts or
troubleshooting, please contact us at support@sunnyhealthfitness.com or 1-877-90SUNNY (877-
907-8669).
#75 M10*15*S6 4PCS
#90φ10.5*φ20*2.0 4PCS
75
75
90
90
93
#79 M10*25*S6 4PCS
#74φ10.5*φ20*2.0 4PCS
79
74
79
74
ASSEMBLY INSTRUCTIONS
S6
75 75
92
1
5
1
6
STEP 1:
Unscrew 4 Hex Socket Head Bolts (No.
#95
75) from Main Frame (No. 1) with Allen
Wrench
Washers (No. 90), the Rear Shipping
Tube (No. 93), and Front Shipping Tube
(No. 92) from Main Frame (No. 1).
You may save these parts [Hex Socket
Head Bolts (No. 75), Flat Washers (No.
90
90), Rear Shipping Tube (No. 93) and
90
Front Shipping Tube (No. 92)] in case
you would like to repackage and transport
this equipment in the future.
STEP 2:
S6
#95
Attach the Front & Rear Stabilizers (No.
5 & No. 6) to the Main Frame (No. 1)
using 4 Hex Socket Bolts (No. 79) and 4
Flat Washers (No. 74). Tighten and
79
secure with Allen Wrench (No. 95).
79
74
74
5
(No.
95).
Remove
4
Flat