X-LINE ADVANCE install system rigging
3.3.2
Attaching the bottom element with a bottom grid kit
Bosch Security Systems B.V.
14. Torque all M10 bolts from the previous element and
the bottom element to 13.5 N*m (120 in*lbs).
1.
Follow the steps 1 through 16 in Attaching elements
under the top element, page 13 , except do NOT
install the front link bars on the bottom element.
Rigging manual
Installation | en
19
2020-06 | V03 | F01U361023