21. Press a 12mm nylon sleeve onto the M12 shoulder
bolts.
22. Apply threadlocker and insert the shoulder bolt
through the grid sidearm and into the end of the
spreader bar. Torque to 13.5 N*m (120 in*lbs) using
a torque wrench.
6 mm
23. Attach the grid and top element to the venue using
options A, B, or C, as indicated in PREVIEW.
Suspend the grid and top element off the ground
surface.
Option A: Two lift points on a single spreader bar.
Option B: A single lift point.
Option C: Two lift points on dual spreader bars.