K&A Manufacturing 6703 Zinser Street Schofield, WI 54476 Phone: 800.298.4351 Fax: 866.882.9475 www.raproducts.com Version Dated: 7/1216 NewHeights™ Series 4 NFD Fixed 3-Leg Workstation Assembly Instructions Read all the instructions before beginning. Instruction # 53322 Hardware Pack # 53147 Page1 OF 6...
Page 2
Tools Required for Assembly: Power Driver W/Adjustable Torque #2 Phillips Head Driver Bit or #2 Square Head Driver Bit K&A Manufacturing 3/16" Hex Head Driver Bit or 6703 Zinser Street Schofield, WI 54476 Phone: 800.298.4351 Allen Wrench Fax: 866.882.9475 www.raproducts.com Tape Measure Level 53638...
Page 3
Step 1: Lay the worksurface 1 on a protected surface with the pilot holes facing up. If your workstation has joiner plate(s) and/or u-channel(s) install them as K&A Manufacturing 6703 Zinser Street Schofield, WI 54476 follows. If not, proceed to Step 3. Attach the joiner Phone: 800.298.4351 plate 3 centered on the seam and about 3"...
Page 4
Step 3: Place (3) leg assemblies 5 on the work- surface 1 aligning the holes in the worksurface supports with the pilot holes in the worksurface. K&A Manufacturing The leg assemblies are interchangeable. Attach the leg 6703 Zinser Street Schofield, WI 54476 Phone: 800.298.4351 assemblies with (4) wood screws 4 in the outside Fax: 866.882.9475...
Page 5
Step 4: There are two cross supports 11 for this workstation. The one used in this step (desk side) will be 5" shorter than the worksurface. With the help of an assistant, align the cross support with the stickers on both leg assemblies.
Page 6
Step 5: Slide a weld nut 9 into the groove in the front of the cross support 11 . The projections on the weld nut must face out. Step 6: Insert an end cap 8 into each end of the cross support. Page 6 OF 9 Instruction # 53322...
Page 7
Step 7: Build the subassembly shown below. Slide a weld nut 9 into the groove in the cross support 11 . The projections on the weld nut must face out from the groove. K&A Manufacturing With the help of an assistant, insert (4) socket screws 6 6703 Zinser Street Schofield, WI 54476 Phone: 800.298.4351 through the holes on the wide side of the L-bracket...
Page 8
Step 11: With the help of an assistant, set the work- station upright in its final location. Level the workstation if required by turning the leveling glides clockwise (from K&A Manufacturing the top) on the low corners of the unit. If your workstation 6703 Zinser Street Schofield, WI 54476 Phone: 800.298.4351 has casters, level it by turning the bolts at the top of the...