40
Startup and Service
2.
Pivot cover down to open the fuse holder.

Figure 13: Opening the Fuse Holder

3.
Remove the old fuse (if any) and install the new fuse.

Figure 14: Replacing the Fuse

4.
Close the fuse holder.
5.
Push the fuse holder back into the I/O module housing.
The field supply to the downstream I/O modules is restored when pushing the
fuse holder back into place.