ATLAS D ECO 56 UNIT
Pump pressure adjustment
The pump is factory-set to 12 bar. Use an oil bath gauge to check the pressure. The pres-
sure can be adjusted between 11 and 14 bar.
3
5
2
fig. 24- Pump ITALPUMP
5
4
2
fig. 25- Pump DANFOSS
1.
Suction Ø1/4"
2.
Return Ø1/4"
3.
Oil delivery Ø1/8"
4.
Pressure adjustment
5.
Pressure gauge connection Ø1/8"
6.
Vacuum gauge connection Ø1/8"
Combustion head adjustment
The head is adjusted by means of the screw 1, according to the indications of the pointer
2.
1
2
3
4
6
1
3
6
1
fig. 26
cod. 3541Q961 - Rev. 00 - 09/2019
Air damper adjustment
After loosening the screw 3, operating the screw 1, the combustion air is adjusted ac-
cording to the indications of the pointer 2. After adjustment, lock the screw 3.
Position of electrodes - baffle
After fitting the nozzle, check correct positioning of the electrodes and baffle, according
to the dimensions given below. It is advisable to check the dimensions after each oper-
ation on the head.
2÷3
2÷3
fig. 28- Position of electrodes - baffle
4.2 Commissioning
B
Checks to be done at first lighting, and after all maintenance operations that in-
volved disconnection from the systems or work on safety devices or parts of the
boiler:
Before lighting the boiler
Open any on-off valves between the boiler and the systems.
Check the tightness of the fuel system.
Check the pre-filling of the expansion tank
Fill the water system and make sure that all air contained in the boiler and the sys-
tem has been vented by opening the air vent valve on the boiler and any vent valves
on the system.
Make sure there are no water leaks in the system, hot water circuits, connections or boiler.
Make sure the electrical system is properly connected and the earth system works
properly.
Make sure there are no flammable liquids or materials in the immediate vicinity of
the boiler.
Fit the pressure gauge and the vacuum gauge on the pump (remove after starting)
of the burner.
open the gate valves along the diesel pipe
Lighting
P
P
fig. 29 - Starting
A
When the thermostatic line closes, the burner motor starts turning together with the
pump: all the oil sucked is sent to the return. The burner blower and the ignition trans-
former are also working, therefore the following stages are carried out:
firebox preventilation.
prewash of a part of the oil circuit.
preignition, with discharge between electrode tips.
2
3
MAX
4
AIR
2
ARIA
M
STOP
AIR
A
4
1
MIN
X
AIR
2
LUFT
STOP
AIRE
1
M
N
I
fig. 27
3
VE
G
VE
G
EN
1
ARIA
AIR
LUFT
AIRE
6÷6,5
33