Measures For Preparation; Unpacking; Storage - Samson 4708 Series Mounting And Operating Instructions

Supply pressure regulators
Table of Contents

Advertisement

Measures for preparation

4 Measures for preparation
After receiving the shipment, proceed as fol-
lows:
1. Check the scope of delivery. Compare
the shipment received with the delivery
note.
2. Check the shipment for transportation
damage. Report any transportation dam-
age.

4.1 Unpacking

Note
Do not remove the packaging if the supply
pressure regulator is to be transported to
another location or kept in storage.
Before mounting the supply pressure regula-
tor, proceed as follows:
1. Remove the packaging from the supply
pressure regulator.
2. Dispose of the packaging in accordance
with the valid regulations.
NOTICE
!
Risk of damage to the supply pressure
regulator due to foreign particles entering it.
Do not remove the protective film until
immediately before mounting.
28

4.2 Storage

NOTICE
!
Risk of damage to the supply pressure
regulator due to improper storage.
Observe the storage instructions. Contact
SAMSON, if need be.
Storage instructions
− Protect the supply pressure regulator
against external influences (e.g. impact,
shocks, vibration).
− Do not damage the corrosion protection
(coating).
− Protect the supply pressure regulator
against moisture and dirt. In damp
spaces, prevent condensation. If
necessary, use a drying agent or
heating.
− Pack the supply pressure regulator in air-
tight packaging.
EB 8546 EN

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents