Measures For Preparation; Unpacking; Transporting And Lifting - Samson 43-1 Mounting And Operating Instructions

Temperature regulators
Table of Contents

Advertisement

4 Measures for preparation

After receiving the shipment, proceed as fol-
lows:
1. Check the scope of delivery. Compare
the shipment received with the delivery
note.
2. Check the shipment for transportation
damage. Report any damage to
SAMSON and the forwarding agent
(refer to delivery note).

4.1 Unpacking

NOTICE
!
Risk of regulator damage due to foreign par-
ticles entering the valve.
The protective caps fitted on the inlet and
outlet of the valve with flanged body prevent
foreign particles from entering the valve and
damaging it.
Do not remove the protective caps until im-
mediately before installation.
Note
Do not remove the packaging until immedi-
ately before installation.
The components (valve, control thermostat
and, if applicable, thermowell) of the regula-
tor are delivered separately. Before installing
the valve, proceed as follows:
1. Remove the packaging from the regula-
tor components.
2. Dispose of the packaging in accordance
with the valid regulations.
EB 2171 EN
Measures for preparation

4.2 Transporting and lifting

Due to the low service weight, lifting equip-
ment is not required to lift and transport the
regulator (e.g. to install it into the pipeline).
Transport instructions
Protect the device against external influ-
ences (e.g. impact).
Do not damage the corrosion protection
(paint, surface coatings). Repair any
damage immediately.
Protect the device against moisture and
dirt.
Observe the permissible ambient tem-
peratures (see section Table 1).
23

Advertisement

Table of Contents
loading

This manual is also suitable for:

43-2

Table of Contents